Customer, Project & Experience List
PROJECT | DESCRIPTION | SCOPE OF WORK | CLIENT | DATE |
Fishing Vessel Requirement – United Kingdom. | Surplus refurbished Osprey Expedition Fishing Vessel, 26’0”, Inboard 6 Cyl Diesel Engine, Year build 2004. | Sale | West Scotland United Kingdom | Jul-18 |
Flexible Flowline Sale – United Kingdom. | Circa 8400m Unused Sunsea Surplus 6” Wellstream Flexible Flowline – Static | Sales Commission | Addax Petroleum Ltd – Switzerland / Isle of Man | Nov-17 |
Requirement – Cameroon West Africa. | Temperature and Pressure Control Valves | Sale | Petrofac Emirates LLC / Gaz du Cameroon West Africa | Aug-17 |
Drain Vessel Valves – Kurdistan Iraq. | Ball & Swing Check Valves, 2” x 2”x 600#, 3” x ¾” x 150# & 600#, 3” x 1” x 600#, 4” x 4” x 600#, 7” x 2” x 150# | Sales Commission | KAR Construction & Engineering Company Ltd | Aug/ Nov 2017 |
Requirement – Cameroon West Africa | Fisher 2” Angle Control Valves and Actuators | Sale | Petrofac Emirates LLC / Gaz du Cameroon West Africa | May-17 |
Pipe Line Valves – Kurdistan Iraq | 36” Dia x 600# Perar Ball Valves c/w Rotork IQ35A Electric Gearboxes plus Gear Operated Manual Gear Boxes | Sale | KAR Construction & Engineering Company Ltd | Apr-17 |
Pipe System Development – Kurdistan Iraq | Dia 6” x 16000m, 12” x 10000m and 16” x 1200m Sch40 CS Line Pipe, API5L X42 Pipe c/w 3LPE External Coating | Sales Commission | SALP Middle East / Oryx Petroleum Hawler Kurdistan Ltd | Sep-16 |
Unused Anchor Availability – United Kingdom | Stevpris Mk6 15 Tonne Unused Surplus Anchor availability | Sales Commission | Maersk Oil & Gas UK Ltd | Mar / Apr 2016 |
Component Requirement – Kurdistan Iraq | Jordan Mk60 Regulator | Sale | HKN Energy Ltd | Nov-15 |
Pipe System Development – Kurdistan Iraq | Dia 6” x 16000m, 12” x 10000m and 16” x 1200m Sch40 CS Line Pipe, API5L X42 Pipe c/w 3LPE External Coating | Sales Commission | SALP Middle East / Oryx Petroleum Hawler Kurdistan Ltd | Sep-15 |
Pipe System Development – Kurdistan Iraq | Dia 6” x 16000m, 12” x 10000m and 16” x 1200m Sch40 CS Line Pipe, API5L X42 Pipe c/w 3LPE External Coating | Sales Commission | SALP Middle East / Oryx Petroleum Hawler Kurdistan Ltd | Aug-15 |
Offshore Mooring Equipment – Offshore Tunisia | 185mm Studlink Anchor Chain 70mm Dia x 6 Lengths, plus 12 No 70mm Dia Kenter Joining Shackles | Sale | SEREPT Oil & Gas Tunisia | Aug-15 |
Pipe Line Valve Actuators – Kurdistan Iraq | Bettis Gas / Hydraulic and Rotork 400VAC 50Hz Electric Actuators for Valbart 36” Dia 600# Ball Valves | Sale | KAR Construction & Engineering Company Ltd. | May-15 |
Development Project – Kurdista Iraq | Assorted Piping Materials c/w External Shrink Sleeves | Sales Commission | Oryx Petroleum Hawler Kurdistan Ltd | Jan-15 |
Zubair & Rafidiya Project – Kurdistan Iraq | Pneumatic ESD Valves and Actuators | Sales Commission | Weatherford Oil Tool ME | Jan-15 |
Pipe System Requirements – Kurdistan Iraq | 8” Dia x 600# A216 WCB Body with SS316 Trim Flange End API6D Ball Valves c/w Gear Operated Manual Gear Boxes | Sales Commission | Oryx Petroleum Hawler Kurdistan Ltd | Oct-14 |
Steel Pipe Elbow Requirement – Bab Habshan 1 Development – Abu Dhabi UAE | Various 1.5D x 90 Deg x 8”Dia and Long Radius Sch120 Pipe Elbows | Sales Commission | Petrofac Emirates LLC | Oct-14 |
Gas Compressor Package Sale – Switzerland / Nigeria | Unused Surplus SOLAR T70 Gas Compressor Package | Sales Commission | Addax Petroleum / PLS LLC Armenia | Jul-14 |
Temporary Flare Line Materials – Kurdistan Iraq | Pipe, Valves, Flanges, Fittings, Gaskets, Stud bolts and Nuts | Sales Commission | Oryx Petroleum Hawler Kurdistan Ltd | May / June 2014 |
Pipe System Requirements – Kurdistan Iraq | Flanges, Fittings and Gaskets | Sales Commission | Weatherford Oil Tool ME | Apr-14 |
Storage Tank Ventilation – Kurdistan Iraq | Tank Breather and Emergency Relief Vents. | Sales Commission | Oryx Petroleum Hawler Kurdistan Ltd | Apr-14 |
Drilling Float Shoe – Angola West Africa | 36” Down Hole Double Valve Manual Float Shoe’s | Source / Supply | Repsol Angola | Mar-14 |
Line Pipe Supply – Southern Iraq | 1000m x 18” Diameter API5L X60 SAW Pipe c/w 3 Layer Polypropylene Coating | Sales Commission | Weatherford Oil Tool ME | Feb-14 |
Pipe Line Valves – Kurdistan Iraq | 36” Dia x 600# ASTM 350LF2 Flange End Ball Valves c/w Gear Operated Manual Gear Boxes | Sale | KAR Construction & Engineering Company Ltd. | Jan-14 |
Pipe Fittings – Southern Iraq | Pipe Fittings | Sales Commission | Weatherford Oil Tool ME | Nov-13 |
Pipe Fittings – Kurdistan Iraq | Pipe Fittings | Sales Commission | Oryx Petroleum Hawler Kurdistan Ltd | Oct-13 |
System Valves – Kurdistan Iraq | 16” Dia x 600# Gear Operated Trunnion Mounted Ball Valves | Sale | Oryx Petroleum Hawler Kurdistan Ltd / MUSCL | Sep-13 |
Gas Condensate Removal Plants – Nigeria West Africa | 2 x 100mmscfd Unused Surplus new Gas Condensate Removal Plants fully completed, tested and Warranted. | Sales Commission | Global Process Systems LLC / Seplat Petroleum Development Company Ltd | Aug-13 |
Gas Pipeline Project – Iraq | Pipe for Gas Flow line Project | Sales Commission | Weatherford Oil Tool ME | Jan / Oct 2013 |
KNPC-KOC Pipeline Project Kuwait | SAW Pipe | Sale | Petrofac Sharjah UAE | Jul-12 |
Fuel Gas Skid – Nigeria | New Build Fuel Gas Skid | Sales Commission | Bell Oil & Gas / Seplat Petroleum | Jun-12 |
Valve requirement – Nigeria West Africa | Dual Plate Wafer Check Valve, Ball Valve & Piston Check Valve Assemblies. 3” thru to 8”, & 600# to 2500# Rating. | Source / Supply | AMNI International Petroleum Development Company Ltd | Apr-12 |
Line Pipe Supply to Pipe Requirement – Chad Central Afica | 6000m x 6” Dia Surplus Pipe | Source / Supply / Sales | Raleigh Energy Chad | Apr-12 |
Surplus Material Sale – Egypt | 6000m x 6” Dia Surplus Pipe | Sale | Vegas Oil & Gas SA | Mar-12 |
Taq Taq Project – Northern Iraq | ‘Fast Track’ new 6500m x 6” Diameter API5L Grade B Sch40 Seamless Line Pipe. | Source / Supply / Sales | MUSCL / TTOPCO Turkey | Mar-12 |
Replacement Valve requirement – Nigeria West Africa | Gate Valve Assemblies c/w Hydraulic Actuators. 3 1/8” thru’ to 4 1/16” 5000psi | Supply | AMNI International Petroleum Development Company Ltd | Feb-12 |
Berantai Project Malaysia | Exterran 36”OD x 12’-6” Horizontal Filter Separator, Exterran 66” OD x 33’-0” Vertical Absorber / Scrubber | Supply | Petrofac Malaysia | Jan-12 |
1451 – SPI Inhassoro – Mozambique East Africa | Ball Valve Package – ¾” to 6” Diameter, 150# thru’ to 1500# Rating | Supply | Sasol Petroleum Temane Limitada / Energy & Power Consultants Ltd | Oct-11 |
Petrofac Ltd – Surplus Unused Equipment. UK / Holland / Norway | 10-off Surplus Stevpris Mk5 new and unused 12 Tonne Anchors | Supply / Sales | Petrofac Ltd UK / Sotra Marine Produkter AS Norway | Sep-11 |
San Leon PLC Tarfaya Project Morocco | Electrical equipment and materials | Supply | San Leon Energy PLC / E-Tech Group Ltd | Mar-11 |
Berantai Project Malaysia | Compressor Package comprising Compressor Skid, Gas Generator Skid, Glycol Unit, Scrubber and Cooler Skid. | Supply | Elkin Ltd / Petrofac UK | Feb-11 |
FPF1, Sepat and Barantai Project Malaysia | Material and Equipment sourcing for Semi-Submersible FPF1. | Supply | Petrofac UK | Oct-10 |
San Leon PLC Tarfaya Project Morocco | Supply of Gas Heating, Injection and Treatment Packages for Oil Shale Pilot Project. | Supply | San Leon Energy PLC | Jan – Dec 2010 |
Addax Nigeria | Supply of 2310m x 6” Diameter API5L Grade X52 Line Pipe | Supply | MUSCL Ltd | May-10 |
Semi-Submersible FPF01 Refurbishment | Sourcing of available new & surplus equipment for the refurbishment of Semi-submersible Production Rig | Consultancy | Petrofac Facilities Management Ltd | March 2010 to Year end |
ExxonMobile Nigeria | Supply of 10” and 12” Diameter API5L Grade X65 Line Pipe | Supply | MUSCL Ltd | Mar-10 |
Tarfaya Project Morocco | Refurbished and New Gas Injection / Process / Power Generation Packages for hot gas injection for refurbishment for Oil Shale Pilot Plant | Supply | San Leon Energy Ltd | Feb 2010 to Year end |
Tarfaya Project Morocco | Surplus Material & Equipment sourcing for refurbishment for Oil Shale Pilot Plant | Consultancy | Target Developments Ltd / San Leon Energy Ltd | Feb-10 |
ExxonMobile Nigeria | Supply of multiple Diameters of API Line Pipe | Supply | MUSCL Ltd | Jan-10 |
Tarfaya Project Morocco | Surplus Material & Equipment sourcing for refurbishment for Oil Shale Pilot Plant | Consultancy | Target Developments Ltd / San Leon Energy Ltd | Jan-10 |
Kurdistan Development | Supply of 1 x Diesel & 1 x Electric new Fire Water Pumps | Supply | Crescent Petroleum Company UAE / Dana Gas | Jul-09 |
Kurdistan Development | Supply of 14 x new Electric Motors | Supply | Crescent Petroleum Company UAE | May-09 |
Kurdistan Development | Supply of 2 x new Pumps & Motors | Supply | Crescent Petroleum Company UAE | Mar-09 |
ExxonMobile Nigeria | Supply 60m of 10” Diameter API5L Grade X65 Line Pipe | Supply | MUSCL Ltd | Jan-09 |
BP Angola FPSO Compression Requirement | Source and Supply of ‘Fast Track’ new manufacture 2-off Check Valves for Gas Compression system. | Source and Supply within 8 weeks – commissioned sale | BP Angola via Wilson UK Ltd | Aug-08 |
Dutch North Sea Pipe Line Project | Source and Supply of ‘Fast Track’ new manufacture 20” x 1500# WNRF Flanges, Stud Bolts and Gaskets | Source and Supply within 7 days | Shell Holland via Corlido B.V. | Aug-08 |
Taq Taq Project – Northern Iraq | Source and Supply of ‘Fast Track’ new 9000m x 16” Diameter API5L X65 Polypropylene coated Line Pipe. | Source and Supply – Commissioned Sale | TTOPCO Turkey / Addax Petroleum | Jul-08 |
Nortechs FPSO Conversion | Sourcing and Sale of new Helicopter Fuelling Skid | Commissioned Sale | Nortechs FPSO | Jul-08 |
General Sales | Consultancy and Sales Support for supplies relating to the Onshore and Offshore Oil & Gas Industry | Consultancy | Pan Gulf Project Management and Consultancy – UAE | Jan 2008 to present – ongoing. |
Nortechs FPSO Conversion | Sourcing and Sale of Surplus Man Riding Pedestal Crane | Commissioned Sale | Nortehs FPSO / Compass Energy Pte Ltd | May-08 |
General Sales | Sale of Surplus 4000m x 16” Line Pipe | Commissioned Sale | Undisclosed | Nov-07 |
Petrofac Chergui Project – Tunisia | Project Engineering support for the ‘Fast Track’ sourcing of materials and equipment for onshore Gas Processing Plant and Onshore Gas Wells | Consultancy | Petrofac UK Ltd | March 2008 to November 2008 |
General Sales | Sales of new 1MW Diesel Generator to Middle East Client | Commissioned Sale | Power Systems Ltd | Sep-07 |
Talisman Kildrummy Project – UK North Sea | Purchase and Sale of 5500m Surplus new Electro Hydraulic Control Umbilical to UK Operator for new Field Development | Purchase, Sale and Project Management | Talisman Energy Ltd / CNR International Ltd – UK | Oct-06 |
BTC Pipeline Project – Azerbaijan | Purchase and Sale of Project Surplus certified Electrical and Instrument Cable from BTC Pipeline | Purchase, Sale and Project Management | Petrofac International Ltd / Innovative Technologies Ltd – UAE | Oct-06 |
Subsea Project – UK North Sea | Subsea API 4” – 5000psi WN Flanges with Stainless Steel Ring Groove Inlays – Sourcing of existing stock and engineering modification to Specification | Fast track sourcing and Engineering modification | Subsea 7 Limited – UK | Aug-06 |
Shell Corrib Field Development – Ireland | Sale and Project Engineering of 3 x 5000psi unused NKT Subsea Flexible Flowlines to Australian Operator | Commissioned Sale and Project Engineering Support | Shell Exploration and Production – Southern Ireland | May-06 |
Unknown | Consultancy Services to Supplier / Manufacturer for the sale of Valves | Engineering Consultancy | Aberdeen Valve Supplies Ltd – UK | Apr-06 |
BTC Pipeline Project – Georgia | Sale and Expediting of end of Project Metso LT105S Tracked Crusher Plant | Commissioned Sale | Spie Capag PEtrofac International Ltd = Georgia | Apr-06 |
Joanne Subsea Development – UK North Sea | Sale of Unused Surplus FMC Horizontal Subsea Xmas Tree and Protection Structure | Purchase, Sale and Project Management | Talisman Energy Ltd / Conoco Phillips Petroleum Company Ltd – UK | Oct-05 |
BTC Pipeline Project – Georgia | Onsite Inspection of available end of Project Construction Plant, Vehicles, Generators and associated spares | Inspection | Pan Gulf Project Management and Consultancy – UAE | Sep-05 |
Bibby Offshore LP6 Subsea Project | Sourcing of Supplier for Fast track supply of Subsea Valves | Commissioned Sourcing | Pegasus International Ltd Aberdeen – UK | Jun-05 |
General Middle East Projects | Location of Onshore project requiring supply of Multiple Power Generation Packages | Commissioned Sourcing | Pan Gulf Project Management and Consultancy – UAE | Jun-05 |
Tweedsmuir Subsea Development – North Sea | HP HT 55km Subsea Tie Back | Engineering – Consultancy Material Availability Study | Talisman Energy Ltd – UK | 2004 |
Sabratha Project – Libya | Skid Beams & Buoyancy Tanks for 20,000 Tonne Jacket. | QA/QC Welding Inspection. | Saipem – ENI Group – Italy / Bulgaria | 2004 |
Galata Project – Bulgaria – Black Sea | Turn Key Gas Field Development | Project Management of FEED, Detail Design | Petreco SARL / Melrose Resources UK Ltd | 2001-2004 |
Unmanned Offshore Platform | Procurement & Expediting | |||
25km Offshore Pipeline | Fabrication | |||
Onshore Gas Dehydration Plant | Installation | |||
60km Onshore Pipeline | Commissioning | |||
Metering Station | ||||
Hot Tap Tie-In to Trunk Line | ||||
Mubarak Pumping Station – Egypt | Stainless Steel Piping Materials for Pump Stations. | Procurement & Expediting | Skanska Cementation International Ltd | 2002 |
North Sea Subsea Tie-Back | Linepipe Replacement Sourcing and Supply – UK. | Procurement & Expediting | Talisman Energy (UK) Ltd | 2002 |
Etacom – Belgium | Electrical Copper Busbar supply. | Procurement & Expediting | Bechtel (UK) Ltd / Equinix Inc USA | 2002 |
Al Jaber Establishment – UAE Middle East. | Generator and Internet hotel Electrical Equipment Package | Procurement & Expediting | Bechtel (UK) Ltd / Equinix Inc USA | 2002 |
NW Highlander Kildrummey Project – United Kingdom. | Subsea Tie-Back | Engineering Consultancy | Talisman Energy (UK) Ltd | 2002 |
Ranger Anglia North West Project – United Kingdom | Subsea Step-out. | Engineering Consultancy & Equipment Sourcing | Aquation Ltd | 2002 |
Civil Construction Project – UAE. | Construction Equipment. | Procurement & Expediting | Best Brother Used Heavy Equipment – UAE. | 2002 |
Longville Ltd – United Kingdom. | Air Cooled Chiller Unit Package | Procurement & Expediting | Bechtel (UK) Ltd / Equinix Inc USA | 2001 |
West Africa Offshore – Oil Development | FPSO Materials and Equipment Identification | Engineering Consultancy | Vanguard Floating Production Ltd | 2001 |
Addax Ltd – Nigeria | Fast Track Supply High Pressure Drilling Hoses out of USA | Procurement & Expediting | Murphy Universal Supply Chain Ltd / Addax Ltd | 2001 |
Platform Upgrades | Offshore Platform Monorails | Procurement & Expediting | Brunei Shell Petroleum Company Sdn | 2001 |
South Pars Project – Iran | Pipe Fittings & Flanges | Procurement & Expediting | CCC/OEC Abu Dhabi | 2001 |
Power Generation UAE | Generator Supply | Procurement & Expediting | Best Brother Used Heavy Equipment – Dubai | 2001 |
Bahrain Shipyard | Lubricant & Slipway Grease | Procurement & Expediting | IOEC UK Ltd | 2001 |
Bahrain Shipyard | Construction Steelwork Supply – Iran | Procurement & Expediting | IOEC UK Ltd | 2001 |
South Pars Project – Iran | Pipe Supply | Procurement & Expediting | IOEC UK Ltd | 2001 |
South Pars Project – Iran | Plate Supply | Procurement & | IOEC UK Ltd | 2001 |
Expediting | ||||
Oil Trunk Line – Sudan | Fabricated Duplex Pipe Bends | Procurement & Expediting | GNPOC Sudan | 2001 |
South Pars Project – Iran | Large Diameter Flange Sets | Procurement & Expediting | CCC/IOEC Abu Dhabi | 2001 |
South Pars Project – Iran | Plate and Pipe Supply | Procurement & Expediting | IOEC UK Ltd | 2001 |
West Africa Offshore Project | Flexible Flowline Sourcing, Inspection and Pressure Testing in UK. | Project Management | Van Esch International b.v. | 2000 |
Shurtan Project – Uzbekistan | Multiple Flange Sets | Procurement & Expediting | ABB Lummus Global GmbH | 2000 |
DSND Subsea Ltd – United Kingdom. | Selection and Procurement of Temporary Export System. | Engineering Consultancy | DSND Subsea Ltd | 2000 |
IGCC Plant – Italy | Replacement Main Process Gate Valves | Engineering Re Fitting Procurement & Expediting | ABB Lummus Global GmbH | 2000 |
SDND Subsea Ltd – United Kingdom. | Flexible Flowline | Procurement & Expediting | DSND Subsea Ltd | 2000 |
Mossel Bay Offshore Gas Development – South Africa | Urgent process Ball Valve Replacement | Procurement & Expediting | SA Five Engineering Ltd | 2000 |
Tihama V Wadisham Project – Yemen (Middle East) | Large Diameter Outfall and Water Transfer Pipe | Procurement & Expediting | Al Hashedi Company | 2000 |
FPSO Project – Singapore | General FPSO Topsides Valve Supply – Singapore. | Procurement & Expediting | IKM Testing Asia Pte Ltd | 1999 |
OPL 230 Project – Nigeria (West Africa) | Subsea Flowlines, Bends, Valves, Actuators, Pipe Flange Sets. | Procurement & Expediting | Brass Exploration Unlimited | 1999 |
FPSO 1 Project – Singapore. | General FPSO Topsides Ball Valve Supply – Singapore | Procurement & Expediting | IKM Testing Asia Pte Ltd | 1999 |
From Britannia Project to Shell Brunei – Iron Duke Project | Surplus 14” Concrete Coated Linepipe Sale – Topside Valves and Fittings | Procurement & Expediting Re Engineering & Construction Support | IPP Inc Sdn. Bhd. Malaysia | 1998 |
North Sea – Braemar Project | Subsea Development Project Costing – UK | Engineering Consultancy | Target Developments Ltd | 1998 |
Power Generation – United Kingdom | Surplus Generator Sales – UK | Procurement & Expediting | Airocastle Ltd | 1998 |
Power Generation – UK | Surplus Generator Sales – UK | Procurement & Expediting | Holywell Park Ltd | 1998 |
North Sea Project Development | Subsea Duplex Ball and Actuator Supply – UK | Procurement & Expediting | Ranger Oil (UK) Ltd | 1998 |
North Sea Project Development | Surplus New Flexible Flowline Sale to Kerr McGee – UK | Procurement & Expediting | ARCO British Ltd | 1997 |
Drilling Program – Egypt | New Drill Pipe Supply – UAE Middle East | Procurement & Expediting | Woodhouse International UAE | 1997 |